E-paw's kitbash summer '09 challenge

Forum run contests of any kind

Moderators: ngauger, ezdays

E-paw's kitbash summer '09 challenge

Postby e-paw on Jun 21st, '09, 20:02

Here we go now.I chose to bash a Walthers Carfloat apron in HO scale.It was a partially assembled (poorly) and damaged kit I picked up some time ago for a steal, Perfect kitbash fodder. I will have to "unglue" most of the kit somehow to get all the parts to line up properly. The Headhouse and steal pear will have to go,They will be back dated to some thing a little less modern looking. the apron rail will be electrified and a system for getting power to the barge will be added because I intend to move some small locos over the water also.
bash 001.jpg
bash 001.jpg (129.98 KiB) Viewed 341 times

Because of the nature of this bash I'll need to build it in place. So first up is to prep the layout where it is to be installed.
bash 004.jpg
bash 004.jpg (126.55 KiB) Viewed 341 times

That is the future site of the Susquehanna river. I first figured out the height of the "high water mark" and build the river bed from 1/2 inch ply wood. It was then covered with a layer of Durham's water putty and painted a dark green.
bash 005.jpg
bash 005.jpg (127.91 KiB) Viewed 341 times
cook with coal
User avatar
e-paw
Conductor
 
Posts: 819
Images: 0
Joined: Dec 15th, 2008
Location: Saylorsburg PA

E-paw's kitbash summer '09 challenge

Postby e-paw on Jun 21st, '09, 20:18

Next I put the apron in place to see how it would fit. I made some reference marks for a card stock backing that will become the retaining wall that keeps the Susquehanna out of Catawissa the western extent of my mainline.
bash 006.jpg
bash 006.jpg (102.34 KiB) Viewed 337 times

bash 007.jpg
bash 007.jpg (108.53 KiB) Viewed 337 times

This will serve as flat area for me to install some coffee stirrers that were stained and distressed. they were cut into scale 10 foot lengths and glued to the backing.That makes up the first part of the retaining wall, pilings and other details will be added later. So now on to some real kitbashing.
bash 010.jpg
bash 010.jpg (126.92 KiB) Viewed 337 times
cook with coal
User avatar
e-paw
Conductor
 
Posts: 819
Images: 0
Joined: Dec 15th, 2008
Location: Saylorsburg PA

Re: E-paw's kitbash summer '09 challenge

Postby eightyeightfan1 on Jun 22nd, '09, 19:05

Looks like you got a great project going there.
Neat idea using popsicle sticks for the wall.
Torrington, Ct.
NARA Member #87
I went to my Happy Place, but it was closed for renovations.
User avatar
eightyeightfan1
Moderator
 
Posts: 1549
Images: 2
Joined: Dec 2nd, 2008

E-paw's kitbash summer '09 challenge

Postby e-paw on Jun 24th, '09, 20:56

Lets start on the apron.I had to disassemble it as much as possible,Some of the pieces were put on backwards by the original owner..
bash 011.jpg
bash 011.jpg (156.43 KiB) Viewed 306 times

Next I got everything glued up so it was square, straight, plumb, and level. this part of the kit will remain pretty much unchained, Just some paint and weathering when it's time.I started on the counter weights at this point also. I don't like the way Walther's attaches them to the cable from the head house with string just coming out of the top of it, I'll come up with a better way later. For now the putty that fills in the joints needs to dry.
bash 015.jpg
bash 015.jpg (106.98 KiB) Viewed 306 times

The next step was to move on to the bridge. I had to fabricate one of the triangle shaped braces because one was missing from the kit. ( not to hard at all.)
bash 012.jpg
bash 012.jpg (69.46 KiB) Viewed 304 times
I'll cover up those round marks from the molding process later.
cook with coal
User avatar
e-paw
Conductor
 
Posts: 819
Images: 0
Joined: Dec 15th, 2008
Location: Saylorsburg PA

E-paw's kitbash summer '09 challenge

Postby e-paw on Jun 24th, '09, 21:25

Then I decided to work on the way that I was going to get power from the bridge to the car float. I wanted a way that was hidden from view and not be some clunky cable that I would have to hide. After some thought I came up with this.
bash 014.jpg
bash 014.jpg (119.87 KiB) Viewed 305 times
I cut a grove in the hold down pins that connect the bridge to the barge and glued a section of brass rod in it. Next I soldered up some wipers that fit in under them where they slide out of on the bridge.
bash 016.jpg
bash 016.jpg (54.23 KiB) Viewed 307 times
They make contact with the hidden rod when the hold down pins are extended out to lock the car float in place. That will in turn make contact with another set of contacts on the barge (when I put that together) basically a mirror image of what I have here, bringing power out to it. When it was all put together it looks like this.
bash 017.jpg
bash 017.jpg (80.93 KiB) Viewed 306 times
The other end of the wire will be soldered to the under side of the rail on the apron. All of the tracks on the carfloat system are to be on one block, I am using plain old cab control and not dcc. If I was to change over this wiring would work out just fine for dcc also.
cook with coal
User avatar
e-paw
Conductor
 
Posts: 819
Images: 0
Joined: Dec 15th, 2008
Location: Saylorsburg PA

Re: E-paw's kitbash summer '09 challenge

Postby e-paw on Jun 24th, '09, 21:31

The last thing for today is the supporting hinge for the bridge. I had to rework it a little because I am not using the 2 steal pears that come with the kit.
bash 013.jpg
bash 013.jpg (99.21 KiB) Viewed 308 times
It will eventually look like poured concrete.
cook with coal
User avatar
e-paw
Conductor
 
Posts: 819
Images: 0
Joined: Dec 15th, 2008
Location: Saylorsburg PA

Re: E-paw's kitbash summer '09 challenge

Postby nachoman on Jun 24th, '09, 22:02

Great start. I can see there is going to be some stiff competition for this contest!
--
Kevin

My HO/HOn3 layout:
viewtopic.php?f=46&t=542
User avatar
nachoman
Engineer
 
Posts: 1634
Joined: Dec 15th, 2008
Location: Arizona

Re: E-paw's kitbash summer '09 challenge

Postby upnick on Jun 25th, '09, 03:33

Look forward to seeing more progress on this one very interesting project :tada: :D
User avatar
upnick
Conductor
 
Posts: 478
Images: 2
Joined: Dec 15th, 2008
Location: Burnley Lancashire U.K.

Re: E-paw's kitbash summer '09 challenge

Postby ocalicreek on Jun 26th, '09, 01:24

Excellent! Good 'ole Durham's water putty. Nice choice for the river color as well, btw.

Galen
When I'm not playing with trains, I may just be in the garden! Follow along here: http://gallimoregardening.blogspot.com
ocalicreek
Conductor
 
Posts: 780
Images: 113
Joined: Dec 15th, 2008

Re: E-paw's kitbash summer '09 challenge

Postby Ralph on Jun 26th, '09, 06:39

Nice! Looking forward to more. :tada:
Ralph
An impression of Penn Central railroading with the freelanced Kings Port & Western thrown in for color. :)
User avatar
Ralph
Moderator
 
Posts: 1595
Joined: Dec 3rd, 2008
Location: St. Paul, MN

Re: E-paw's kitbash summer '09 challenge

Postby Trucklover on Jun 26th, '09, 10:08

Looking good :tada: :tada: I like this idea, and im really looking forward to seeing it completed :cheers:
Josh Mader

>>>Maders Trains<<<
Offering everyday low prices for the Model Railroad World



Modeling the La Mirada, CA Industrial District in HO Scale:

Trackplan
Module Layout Progress
User avatar
Trucklover
Engineer
 
Posts: 1900
Joined: Dec 14th, 2008
Location: Rancho Santa Margarita, Cali

E-paw's kitbash summer '09 challenge

Postby e-paw on Jun 26th, '09, 21:25

Well I changed my mind , Just couldn't leave well enough alone and decided to add an operators shed half way up one side of the of the steelwork. I glued up some I-beams and u-channel to support the new structure.
bash 020.jpg
bash 020.jpg (159.49 KiB) Viewed 260 times



next I added a pulley system to the counter weights to give them some more heft.
bash 018.jpg
bash 018.jpg (154.96 KiB) Viewed 259 times
They are just some and scrap triangular shaped braces glued together with some washers as the pulleys.

In order to hide the round dimples on the inside edge of the bridge section I cut some U-channel to fit and glued them in place over the offending spots.
bash 019.jpg
bash 019.jpg (135.73 KiB) Viewed 260 times
Last edited by e-paw on Jun 26th, '09, 21:55, edited 1 time in total.
cook with coal
User avatar
e-paw
Conductor
 
Posts: 819
Images: 0
Joined: Dec 15th, 2008
Location: Saylorsburg PA

Re: E-paw's kitbash summer '09 challenge

Postby e-paw on Jun 26th, '09, 21:53

On to the head house.... This part I tossed around a little, just wasn't to sure of what to do.I looked at some pictures of other aprons to get some Ideas. I found some that were completely devoid of this structure, just with 2 exposed wheels over the counter weights. Although interesting they kind of looked not right to me and unfinished looking. I saw plenty wooden ones that looked cool (nice and weathered), but there is already lots of wood in the seen with the retaining wall and pilings. I realy did not like the corrugated steel and wanted to change it around somewhat. I thought that concrete would look good and would tie in well with the coalling tower that I built, but could not find any built this way. I could not see any reason why it could not be built like this so that is the way it will be.
bash 021.jpg
bash 021.jpg (149.56 KiB) Viewed 259 times
I used a file to remove the ribs and textured the plastic with some course sand paper.It's the same technique I used on the coalling tower and was pleased with it.

Here are the major subassemblies ready to paint I'll try to get to that tomorrow.
bash 022.jpg
bash 022.jpg (99.84 KiB) Viewed 259 times
cook with coal
User avatar
e-paw
Conductor
 
Posts: 819
Images: 0
Joined: Dec 15th, 2008
Location: Saylorsburg PA

Re: E-paw's kitbash summer '09 challenge

Postby Trucklover on Jun 26th, '09, 23:59

excellent work!! i love the counterweights and the pulley's on them!! :tada: :tada:
Josh Mader

>>>Maders Trains<<<
Offering everyday low prices for the Model Railroad World



Modeling the La Mirada, CA Industrial District in HO Scale:

Trackplan
Module Layout Progress
User avatar
Trucklover
Engineer
 
Posts: 1900
Joined: Dec 14th, 2008
Location: Rancho Santa Margarita, Cali

Re: E-paw's kitbash summer '09 challenge

Postby e-paw on Jun 28th, '09, 18:32

Before I painted the sub assemblies I decided to make provisions for some lighting. It would be hard to hide the wire in such an open structure so I tried to make them look like electrical conduite. I glued them to the inside of the iron work in straight runs from top to bottom to simulate a buried feed to the apron.
bash 024.jpg
bash 024.jpg (131.77 KiB) Viewed 230 times

Then it is off to the paint shop. All the parts got a few coats of either Polly Scale empire green or aged concrete. The same as my coaling bridge.
bash 025.jpg
bash 025.jpg (108.03 KiB) Viewed 226 times

while that dried I started to work on the support for the side fo the bridge that is in the water. I started by carving a block of foam to shape and gluing some stained dowels to the side of it that faces the apron bridge. The rest will be covered with rip raft and dirt.
bash 026.jpg
bash 026.jpg (107.55 KiB) Viewed 223 times
cook with coal
User avatar
e-paw
Conductor
 
Posts: 819
Images: 0
Joined: Dec 15th, 2008
Location: Saylorsburg PA

Next

Return to Contest forum

Who is online

Users browsing this forum: No registered users and 1 guest